Winch and Hoist Solutions -- Lead Time Sheet
Air & Hydraulic Winches Chain Hoists
Model #   Std. Lead Time Hercu-Link HA 8 Weeks
BU7A   1 Week   HA3 12 Weeks
BU7APTAB   1 Week   HE 8 Weeks
EU Series   2 Weeks BOP Systems   10 Weeks
EUL Series   8 Weeks THV & VL2 S.COR.E   8 Weeks
FA150KGMR12-1-E(2)   8 Weeks LCA's    8 Weeks
FA2 Series (1) **   6 Weeks Trolleys
FA2.5 Series (1) **   6 Weeks ATC/ATE Trolleys 16 Weeks
FA5 Series (1) **   6 Weeks      
FA7 Series   7 Weeks Air Motors
FA10 Series   7 Weeks 50259-9   3 Weeks
FA2B Series** 5 Weeks DD6M   2 Weeks
FA2.5A Series** 5 Weeks EE3G   4 Weeks
FA5A Series** 5 Weeks EE5M 1 In Stock 3 Weeks
LS1500 or PS2400 8 Weeks EE9G   4 Weeks
LS2-600 or PS2-1000              Contact Factory H5U-A501   3 Weeks
HH5M   5 Weeks
Electric Winches HHM   3 Weeks
Electric Winches 2-6K lbs 6 Weeks KK6M 4 Weeks
Electric Winches 10-15K lbs. 8 Weeks MMP150   10 Weeks
Electric Winches 25K lbs. 10 Weeks MP150   1 Week
EBT Worm Gear Electrics 2 Weeks
Fulcrum Elect.Winch
Lifting Models Std. Lead  Text Box: For options on any model add a minimum of two (2) weeks.  For specific delivery, please contact White House Customer Service.
IR Model Frame Time
EL5300-17-18 3 6 Weeks
EL6000-23-18 3 6 Weeks
EL8200-23-24 4 6 Weeks
EL9200-23-24 4 6 Weeks **April 25th; Week 17 of 2005**
EL14100-22-24 5 6 Weeks
Text Box: Always check the "IN STOCK" page for stocked models.
EL16400-20-24 5 6 Weeks
EL21300-21-24 6 7 Weeks
EL27000-22-24 7 8 Weeks
EL32600-18-24 7 8 Weeks
EL42400-21-30 8 8 Weeks
Pulling Models Std. Lead  Std. Lead    
IR Model Frame Time Time W/Clutch    
EP5300-17-18 3 6 Weeks 6 Weeks
EP6700-20-18 3 6 Weeks 6 Weeks  
EP8200-23-24 4 6 Weeks 6 Weeks
EP11700-13-24 4 6 Weeks 6 Weeks
EP15900-19-24 5 6 Weeks 6 Weeks
EP20600-19-24 5 6 Weeks 6 Weeks
EP26000-17-24 6 7 Weeks 7 Weeks
EP31900-18-24 7 8 Weeks 8 Weeks
EP38400-19-24 7 8 Weeks 8 Weeks
EP45600-20-30 8 8 Weeks 8 Weeks
** Includes Man Riders